INSP Works is being developed to connect field capture, inspection, asset context and reporting. Explore the intended capabilities and the working public concept.
01 / CAPTURE & DRAWINGS
Make the plant easier to understand.
Photos, walk-through video, drone imagery, scans and existing drawings can each contribute different evidence. The goal is a useful drawing with a traceable basis.
Preserve the captureKeep original files, time references and capture conditions. Distinguish requested frames from the images actually recorded.
Locate the subjectOutline visible components and propose asset associations. Retain uncertainty when the plant tag or correspondence is unresolved.
Build the drawingMove from geometry proposals toward editable drawings. Retain original evidence, missing regions and revision history.
Check the dimensionsUse appropriate calibration, independent controls and an agreed acceptance method before relying on dimensions.
A convincing rendering does not establish measurement accuracy. The first field pilot must test the complete capture-to-drawing result.
02 / ASSET CONTEXT
Keep the history with the asset.
A document name, plant tag, installed component and inspection location describe different things. The record needs to preserve those relationships over time.
Identity and revision mechanics prototyped locally
Source-linked identityRecord where an asset association came from. Keep proposed, disputed and reviewed relationships distinct.
Change over timeSeparate replacement equipment from a changed tag or drawing. Preserve the basis for previous observations.
Existing systemsBegin with read-only imports and a defined mapping. Validate a limited handoff before replacing any client system.
03 / FIELD INSPECTION
Give each program the workflow it needs.
A turnaround, a recurring corrosion survey and an equipment inspection should share reliable records without being forced into the same checklist.
Business workflows to be defined with inspection leads
Scope and locationsKeep required items visible, including work that has not been observed or completed. Record the source of a location.
Evidence at the point of workAssociate observations, readings, notes and attachments with the correct asset and event.
Handoffs and correctionsCarry outstanding work across shifts and preserve who changed what. A correction should not erase the earlier record.
Field connectivityOffline capture, synchronization and conflict recovery are design requirements for the field product. This public demonstration is not an offline field application.
04 / REPORTING
Less rebuilding. More reviewing.
Use the recorded evidence to assemble a draft, with clear links back to the source and explicit gaps for the reviewer.
Traceable draftsCarry asset context, observations and source references into the report. Keep entered narrative distinct from original records.
Revision-aware reviewA changed source or drawing may invalidate an earlier review. Preserve the history and identify what needs another check.
Client deliverablesDefine the required template, drawing format and recipient acceptance criteria with each program. Export fidelity and presentation both matter.
Professional decisionsKeep engineering assessment, inspection acceptance and signatures with the appropriately authorized people.
05 / AI ASSISTANCE
Useful assistance. Visible evidence.
The intended assistant helps find records, compare revisions and prepare drafts. It should show the basis for a suggestion and say when the supplied evidence is insufficient.
Live AI integration planned; public example is scripted
The long-term direction is broad. The first commercial proof should be specific: a defined area, agreed drawings and reports, independent quality checks and a complete comparison of delivery effort.
DIFFERENT PROGRAMS, SHARED RECORDS
The workflow follows the inspection program.
These are proposed operating patterns for the inspection lead to define with the client. One turnaround example does not define the whole product.
Corrosion surveys
Bring together circuits, inspection locations, drawing revisions and recorded measurements. Keep the location identity, method and measurement history available for the qualified assessment.
First proof: less drawing and reconciliation effort for the same accepted survey scope.
Turnarounds
Carry the work pack, inspected items, incomplete work and review across shifts. Keep repair decisions and release authority connected to the specific work performed.
First proof: fewer handoff gaps and less report rebuilding at closeout.
Recurring equipment inspection
Connect the equipment record, previous findings, current scope and follow-up work. Separate a replaced component from a changed tag or a newer drawing.
First proof: faster retrieval and an accurate, usable history.
Plant documentation
Use capture to improve plant context and proposed drawings. Keep visible geometry, asset identity, process connectivity and engineering acceptance as separate questions.
First proof: a recipient can locate the required subject and verify the drawing’s basis.
Inspection scope and acceptance remain program-specific. API’s description of API 570 illustrates the breadth of in-service piping work; this site does not implement or certify compliance with that code.
A PATH TO BECOMING THE WORKING SYSTEM
Earn the transition. Keep the history.
Replacing a client’s system is a data, workflow and operating change. The proposed sequence makes each step reviewable.
Map the records
Identify systems, exports, asset identifiers, drawings, measurement units, owners and historical revisions. Record missing or disputed relationships.
Prove the import
Start read-only. Reconcile counts, exact files and important relationships. Review exceptions with the owner instead of silently merging them.
Run in parallel
Deliver one agreed scope through both processes. Compare outputs, corrections, review effort and the complete cost of accepted work.
Agree the cutover
Validate permissions, historical access, exports, recovery and support. Name the system of record and test the return path before expanding.
Integration status: no production connection to a client IDMS, CMMS or plant system is available in this website. Source-system selection and mapping are part of pilot scoping.
CAPABILITY STATUS
See what you can use and what comes next.
Area
Available to explore
Required before operational use
Capture & drawings
Fictional capture walkthrough and downloadable pilot plan.
Real media processing, field controls, editable output and agreed accuracy.
Reporting
Editable fictional drafts, revisions, source comparison and downloads.
Client templates, live evidence, authorized review and release.
Field inspection
Example asset and evidence navigation.
Program workflows, device/offline qualification and measured field usability.
AI assistance
Scripted source-linked questions and responses.
Live models evaluated on relevant records, permissions and failure cases.
System transition
A proposed import, parallel-run and cutover approach.
Chosen source system, reconciled data, operational support and tested recovery.
Business value
Complete-cost worksheet and correction sensitivity.
Comparable accepted field results and recorded delivery costs.